Previous PageNext Page

AN120071 – Boral Resources (NSW) Pty Limited Sydney Metropolitan Concrete Contract Determination

2. AREA INCIDENCE AND DURATION

2.1 This Part A will operate with respect to contracts of carriage between Boral and its Operators engaged at concrete batching plants throughout the Sydney Metropolitan Area.

2.2 This Part A will:

(a) apply to the exclusion of the Transport Industry Concrete Haulage Contract Determination. Vol 260 published 30.11.90 as varied or replaced from time to time;

(b) be read and construed in conjunction with the Boral GST Protocol (Facilitation and Compliance) Contract Determination.

2.3 This Contract Determination will operate in accordance with its terms from the beginning of the first pay period to commence on or after 8 April 2005 and have a nominal term of three (3) years. The nominal term expires on 8 April 2008.

2.4 This Part A will cease to operate on 30 April 2005, when Part B will come into operation.

Top Of PagePrevious PageNext Page