AN120071 – Boral Resources (NSW) Pty Limited Sydney Metropolitan Concrete Contract Determination
1. |
Dictionary |
1.1 |
Definitions |
2. |
Area Incidence And Duration |
2.1 |
Application |
2.2 |
Application Of Other Contract Determinations |
2.3 |
Term. |
2.4 |
Operation |
3. |
Nominated Plants & Cartage Zones |
3.1 |
Nominated Plant |
3.2 |
Cartage Distances |
4. |
Cartage Rates And Related Matters |
4.1 |
Basis Of Cartage Rates |
4.2 |
Surcharges |
4.3 |
Variation Of Cartage Rates And Surcharges |
4.4 |
Award Benefits Etc |
4.5 |
Minimum Earnings |
5. |
Cartage Accounts |
5.1 |
Preparation Of Cartage Accounts |
5.2 |
Cartage Account Details |
5.3 |
Payment Of Cartage Accounts. |
5.4 |
Recent Account Discrepancies |
5.5 |
Older Account Discrepancies |
5.6 |
Adjustment Following Settlement Of Account Discrepancy |
5.7 |
Purchases Other Than Fuel |
5.8 |
Fuel Purchases |
5.9 |
Overpayment By Boral |
5.10 |
No Other Deduction Or Purchases |
5.11 |
Section 127 Statement |
6. |
Living Away From Home |
6.1 |
Being Away From Home |
6.2 |
Notice Of Being Away From Home |
6.3 |
Period Of Working Away From Home |
6.4 |
Transfer Payments |
7. |
Statutory Requirements And Insurance |
7.1 |
Compliance With Laws |
7.2 |
Variation Of Statutory Requirements |
7.3 |
Insurances |
7.4 |
Submission Of Insurance Documents Etc |
7.5 |
Provision Of Photocopies |
7.6 |
Endorsements For Public Liability |
8. |
Loads |
8.1 |
Load Size |
8.2 |
Daily Loading Procedure |
8.3 |
Notification For Next Day |
9. |
Hazardous Approach To Job Site |
9.1 |
Hazardous Approach To Job Site |
9.2 |
Payment After Unsuccessful Entry |
9.3 |
Refusal To Enter |
9.4 |
Bogged Vehicles |
10. |
Availability Of A Suitable Prime Mover |
10.1 |
Vehicle Image Etc |
10.2 |
Obligation To Ensure Vehicle Presented For Work |
10.3 |
Boral Approval To Introduce A Prime Mover |
10.4 |
Weighbridge Certificates |
10.5 |
Repair Of Unserviceable Prime Mover |
10.6 |
Notification To Boral Of Non Attendance |
10.7 |
Roads & Traffic Authority |
10.8 |
Prime Mover Supply, Configuration And Age |
10.9 |
Prime Mover Running Costs |
11. |
Responsibility For Slump, Mixing & Delivery |
11.1 |
Changes To Concrete Mix |
11.2 |
Mixing The Load |
11.3 |
Checking After Loading - Slump |
11.4 |
Minimum Mixing Requirements |
11.5 |
Minimum Mixer Revolutions |
11.6 |
Added Water |
11.7 |
Visual Inspection Of Load Before Leaving The Plant - Irregularities |
11.8 |
Adding Water To Adjust The Slump - Before Discharging On Site |
11.9 |
Adjusting The Slump At Request Of Third Party |
11.10 |
Rejection Of Load Due To Slump |
11.11 |
Obtaining Signatures For Acceptance Of Delivery |
11.12 |
Cod Customers |
11.13 |
Dumped Load |
11.14 |
Delivery To Kerb Making Machine |
11.15 |
High Range Water Reducer |
11.16 |
Reused Concrete |
11.17 |
Load Limit |
12. |
Rostering & Access To Cartage Work |
12.1 |
Rosters |
12.2 |
Access To Cartage Work System |
13. |
Breakdowns |
13.1 |
Transfer Of Vehicles Due To Plant Breakdown |
13.2 |
Assistance When Mixer Or Vehicle Is Broken Down |
14. |
Communication Equipment |
14.1 |
Installation Of Communication Equipment |
14.2 |
Removal Of Communication Equipment |
14.3 |
Taking Care Of The Communication Equipment |
14.4 |
Operation Of Communication Equipment |
14.5 |
Maintenance Of Communication Equipment |
14.6 |
Installation And Removal During Normal Operating Hours |
15. |
Provision Of Mixer |
15.1 |
Provision Of Mixer |
15.2 |
Mixer Removal By Boral |
15.3 |
Mixer Removal By Operator |
15.4 |
Responsibility After Fitting |
15.5 |
Adjustment Of U Bolts |
15.6 |
Removal Of Mixer On Termination Of Engagement |
15.7 |
Provision Of Crank Shaft Protection |
15.8 |
Modifications Etc To Mixer |
16. |
Mixer Care And Maintenance |
16.1 |
Washing Out The Mixer |
16.2 |
Provision Of Cleaning Materials Etc |
16.3 |
Reporting Mixer Maintenance Requirements |
16.4 |
Mixer Repairs |
16.5 |
Minor Maintenance Of Mixer |
16.6 |
Removal Of Hardened Concrete |
16.7 |
Major Maintenance Of Mixer |
16.8 |
Provision Of Fuel For The Mixer |
16.9 |
Parking Of Mixer |
16.10 |
Damage To Mixer |
16.11 |
Cease Using The Mixer For Repairs, Servicing Etc |
16.12 |
Replacement Of Mixer |
17. |
Painting and/or Signwriting |
17.1 |
Boral To Periodically Paint |
17.2 |
Quality Of Painting |
17.3 |
Preparation For Painting |
17.4 |
Time Of Painting |
17.5 |
Period Of Painting |
17.6 |
Meaning Of Vehicle |
17.7 |
Unacceptable Paint Finish |
17.8 |
Time Of Painting Excessive |
17.9 |
Removal Of Logos |
17.10 |
Transport |
18. |
Delegates |
18.1 |
Recognition |
18.2 |
Use Of Facilities |
19. |
Nominated Driver |
19.1 |
Use Of Nominated Driver |
19.2 |
Licences |
19.3 |
Nominated Driver Fitness For Work |
19.4 |
Use Of Relief Driver |
20. |
Uniforms |
20.1 |
Dress |
20.2 |
Uniform |
20.3 |
Wet Weather Gear |
20.4 |
Uniform Replacement |
21. |
Amenities |
21.1 |
Entitlement |
22. |
Major Change, Vehicle And Configuration Variation Etc. |
22.1 |
Decision To Introduce Change |
22.2 |
Mandatory Consultation |
22.3 |
Boral's Right To Make Change |
22.4 |
Boral Buffer Vehicles |
22.5 |
Configuration Change |
23. |
Development And Training |
23.1 |
Objects, Purposes And Commitments |
24. |
Grievance And Disputes Procedure |
24.1 |
Commitment |
24.2 |
Procedure Mandatory |
24.3 |
Steps |
24.4 |
Work To Continue Normally |
25. |
Consultative Committee |
25.1 |
Formation Of Committee |
25.2 |
Sub-Committees |
25.3 |
Committee Procedures |
25.4 |
Proper Performance Of Functions |
25.5 |
Consultation Procedure |
25.6 |
Prior Consultation Before Exercising Rights Etc |
25.7 |
Periodic Reviews By The Committee |
26. |
Continuous Improvement Process |
26.1 |
Participation In Continuous Improvement |
26.2 |
Payment |
27. |
Special Circumstances |
27.1 |
Carting In Other Than Mixer |
27.2 |
Special Or Unique Circumstances |
28. |
Plant Stored Operator's Equipment |
28.1 |
Provision Of Space |
29. |
Boral Operated Vehicles & Fleet Owners Etc |
29.1 |
Use Of Boral Vehicles |
29.2 |
Use Of Fleet Owners |
29.3 |
Limit Of Articulated Vehicles |
30. |
Operating Procedures Etc |
30.1 |
Obligations |
30.2 |
Fines |
31. |
Occupational Health And Safety |
31.1 |
Obligation to Perform the Cartage Work Safely |
31.2 |
RTA Requirements |
32. |
Environmental |
32.1 |
Obligations |
33. |
Good Faith |
33.1 |
Boral Obligation |
34. |
Operator's Rights |
34.1 |
Rights |
35. |
Mixer Ownership |
35.1 |
Applicable Conditions |
36. |
Other Conditions |
36.1 |
Reference |
37. |
Leave Reserved |
37.1 |
Matters |
SCHEDULES |
|
Schedule 1 |
Rates |
Schedule 2 |
Monthly Retainer |
Schedule 3 |
Rate Review & Cost Items |
ANNEXURES |
|
Annexure 1 |
Vehicle Specifications |
Annexure 2 |
Mixer Ownership |
Annexure 3 |
127 Statement |
Annexure 4 |
Selection |
Annexure 5 |
Access To Cartage Work System |