Previous PageNext Page

AN120071 – Boral Resources (NSW) Pty Limited Sydney Metropolitan Concrete Contract Determination

2. AREA INCIDENCE AND DURATION

2.1 Application

This Part B will operate with respect to contracts of carriage between Boral and its Operators engaged at concrete batching plants throughout the Sydney Metropolitan Area to perform the cartage work.

2.2 Application Of Other Contract Determinations

This Part B shall:

(a) apply to the exclusion of the Transport Industry Concrete Haulage Contract Determination. Vol 260 published 30.11.90 as varied or replaced from time to time; but

(b) be read and construed in conjunction with the Boral GST Protocol (Facilitation & Compliance) Contract Determination.

2.3 Term

This Contract Determination shall operate in accordance with its terms from the beginning of the first pay period to commence on or after 8 April 2005 and have a nominal term of three (3) years. The nominal term expires on 8 April 2008.

2.4 Operation

This Part B will operate from 1 May 2005, when Part A ceases to have effect.

Top Of PagePrevious PageNext Page