AN120071 – Boral Resources (NSW) Pty Limited Sydney Metropolitan Concrete Contract Determination

8. LOADS

8.1 Load Size

The customer's requirements or technical requirements will determine the actual load size however Boral and the Operator are jointly committed to ensuring that the legal carrying capacity of the vehicle and the rated capacity of the mixer are not exceeded.

8.2 Daily Loading Procedure

(a) The initial daily starting order will be in accordance with the Access to Cartage Work
System as set out in Annexure 5.

(b) All vehicles will then be loaded in order of their return to the plant except:

(i) mini mix vehicles which may be preferentially loaded;

(ii) single load or message greater than the mixer capacity or legal carrying capacity of the vehicle next in line which may be preferentially loaded;

(iii) articulated vehicles which may be preferentially loaded;

(iv) vehicles with returned concrete (where it is impractical due to facility or time constraints to transfer the returned concrete to the next vehicle in line) which may be preferentially loaded; and

(v) work pool vehicles who will be loaded in accordance with Annexure 5.

8.3 Notification For Next Day

The initial loading time and the initial plant from which such loading is to occur shall be notified by Boral to an Operator before the end of normal operating hours.