Previous PageNext Page

AN120071 – Boral Resources (NSW) Pty Limited Sydney Metropolitan Concrete Contract Determination

30. OPERATING PROCEDURES ETC

30.1 Obligations

An Operator shall perform the cartage work:

(a) (to avoid any doubt) in accordance with this determination;

(b) in accordance with any day to day directions given to them by Boral;

(c) in accordance with any procedures or policies relevant to the performance of the cartage work provided that they have been inducted into the policy or procedure and provided with a copy of it. This includes the provision of a driver's handbook to be maintained by Boral which will includes policies, and procedures;

(d) without jeopardising or damaging Boral's business; and

(e) with due care and skill and in a proper, thorough and professional manner.

30.2 Fines

The Operator is responsible for any fines or other penalties imposed on them:

(a) if the maximum legal pay load carried with their vehicle is exceeded at any time; or

(b) for any breach of any relevant laws except when the Operator is fined for carrying mud or earth off a building or construction site after discharging their load in which case Boral shall pay any such fine provided that the Operator has complied with Boral's environmental policy and procedures.

Top Of PagePrevious PageNext Page