AN120071 – Boral Resources (NSW) Pty Limited Sydney Metropolitan Concrete Contract Determination
30.1 Obligations
An Operator shall perform the cartage work:
(a) (to avoid any doubt) in accordance with this determination;
(b) in accordance with any day to day directions given to them by Boral;
(c) in accordance with any procedures or policies relevant to the performance of the cartage work provided that they have been inducted into the policy or procedure and provided with a copy of it. This includes the provision of a driver's handbook to be maintained by Boral which will includes policies, and procedures;
(d) without jeopardising or damaging Boral's business; and
(e) with due care and skill and in a proper, thorough and professional manner.
30.2 Fines
The Operator is responsible for any fines or other penalties imposed on them:
(a) if the maximum legal pay load carried with their vehicle is exceeded at any time; or
(b) for any breach of any relevant laws except when the Operator is fined for carrying mud or earth off a building or construction site after discharging their load in which case Boral shall pay any such fine provided that the Operator has complied with Boral's environmental policy and procedures.