AP791396CRV - National Electrical, Electronic and Communications Contracting Industry Award 1998
TABLE K - AUSTRALIAN CAPITAL TERRITORY
Special Allowances
(Operative from first pay period on or after 8 October 2005
[Table K substituted by R7670 S2944 S8241; corrected by S8805; substiututed by T3651 PR906322 PR910253 PR920283 PR923343; corrected by PR924414; substituted by PR933445 PR940284 PR947126 PR951994; corrected by PR953145; substituted by PR960265; PR963656 ppc 08Oct05]
CLAUSE
$
18.5.2 (a)
Height Money
18.5.2 (a)(ii)
Height between 12 and 24 metres (per hour)
0.43
18.5.2 (a)(iii)
Height between 24 and 60 metres (per hour)
0.76
18.5.2 (a)(iv)
Height exceeding 60 metres (per hour)
1.50
18.5.2 (a)(ii)+(iii)
Min daily amount for height up to 60 metres (per day)
1.50
18.5.2 (a)(iv)
Min daily amount for height above 60 metres (per day)
3.90
17.5.2.(a)(vi)
Bosun’s chair/scaffold (per hour)
0.29
18.5.2 (b)
Confined Spaces per hour
0.67
18.5.2 (c)
Dirt Money per day
1.63
18.5.2 (d)
Silicate of Cotton, Slag, Insulwool per hour
0.47
18.5.2 (e)
First Aid Allowance
11.60
18.5.2 (f)
Meal Allowance
9.60
18.5.2 (g)
Multi Storey Allowance per hour
0-15 floor
0.39
16-30 floor
0.47
31-45 floor
0.73
46-60 floor
0.91
More than 60 floor
1.17
30.1
Fares & Travel Allowance
30.1.1
Excess fares per day
14.70
30.1.2
Free Transport
1.34
30.1.3
Motor vehicle allowance
0.65
30.1.7
Job site more than 50/Km from Canberra GPO per day
Ordinary Time
30.1.8
Use of employee's vehicle per km
0.35