Previous PageNext Page

AN120071 – Boral Resources (NSW) Pty Limited Sydney Metropolitan Concrete Contract Determination

APPENDIX 5 - CARTAGE RATES

ITEM

TITLE

RATE

UNIT

   

$

 
       

BORAL

Flag fall/Utilisation rate

15.77

cubic metre

A

Kilometre rate

0.99

cubic metre

B

Mixing in the yard

36.95

load

C

Waiting time

1.47

minute

D

Standby time

15.86

half hour

E

Penalty rates

5.09

cubic metre

F

Transfer fee

1.43

kilometre

G

Agitating fee

5.83

quarter hour

H

Hourly vehicle hire

71.59

per hour

I

Hourly hire labour

16.10

per hour

J

Car travelling

0.69

per km

K

Standby vehicle & driver

47.71

per hour

Top Of PagePrevious PageNext Page