Previous PageNext Page

AN120071 – Boral Resources (NSW) Pty Limited Sydney Metropolitan Concrete Contract Determination

APPENDIX 5A - BORAL SYDNEY METROPOLITAN CARTAGE RATES

ITEM

TITLE

RATE

UNIT

   

$

 

BORAL

Flag fall/Utilisation rate

17.95

cubic metre

A

Kilometre rate

0.99

cubic metre

B

Mixing in the yard

49.78

load

C

Waiting time

1.47

minute

D

Standby time

15.86

half hour

E

Penalty rates

5.09

cubic metre

F

Transfer fee

1.43

kilometre

G

Agitating fee

8.20

quarter hour

H

Hourly vehicle hire

83.52

per hour

I

Hourly hire labour

16.10

per hour

J

Car travelling

0.69

per km

K

Standby truck & driver

47.71

per hour

Top Of PagePrevious PageNext Page