AN120071 – Boral Resources (NSW) Pty Limited Sydney Metropolitan Concrete Contract Determination

13. BREAKDOWNS

13.1 Transfer Of Vehicles Due To Plant Breakdown

(a) In the situation of a plant breakdown sufficient vehicles should be transferred to the plant where the work is being diverted to, in order to provide sufficient customer service.

(b) Where it is likely that the plant is out of production for the rest of the day, then an Operator will either be transferred or given permission to finish work for the day. Such decision is to be made within two (2) hours of the initial breakdown.

13.2 Assistance When Mixer Or Vehicle Is Broken Down

An Operator shall initially assist in every practicable way to remove the concrete from the mixer when a breakdown of the mixer or an Operator's vehicle occurs under load. An Operator is not required to participate in the removal of hardened concrete from the mixer save for the operation and positioning of the mixer to assist in concrete removal.