Previous PageNext Page

AN120071 – Boral Resources (NSW) Pty Limited Sydney Metropolitan Concrete Contract Determination

SCHEDULE 1 - RATES

Item

Description

Unit

Six Wheeler

Eight Wheeler

     

$

$

         

A

Retainer

Per Month

5,691

6,285

B

Load Fee

Per Load

21.04

24.19

C

Kilometre Rate

Per KM

1.90

2.16

D

Mixing In Yard

Per Load

21.24

24.21

E

Waiting Time

Per Minute

1.02

1.16

F

Transfer Fee

Per KM

0.95

1.08

G

Standby Time

Per Half Hour

14.89

15.60

H

Out of Hours Surcharge

Per Load

29.78

31.20

 

(Monday -Saturday)

     

I

Own Mixer Rate

Per Load

10.00

12.00

J

Agitating Fee

Per Minute

1.02

1.16

K

Car Travelling

Per KM

0.68

0.68

L

Labour Hire

Per Hour

14.89

15.60

M

Out of Hours Surcharge

Per Load

37.23

39.00

 

(Sunday Public Hol)

     

N

Call Out Fee

Fee

119.12

124.80

Top Of PagePrevious PageNext Page