AN120071 – Boral Resources (NSW) Pty Limited Sydney Metropolitan Concrete Contract Determination
1. Monthly Retainer Payment
1.1 Payment
Subject to this Schedule, Boral shall pay an Operator the relevant monthly retainer payment each month as set out in Schedule 1.
1.2. Requirement to Work Regular Days
An Operator must be available to perform the cartage work on the regular days from their allocated start time and until rostered off by Boral. If they are not then their monthly retainer for the next month shall be reduced by the relevant retainer reduction factor for each regular day they are not available to perform the cartage work from their allocated start time and until rostered off by Boral.
1.3. Final Monthly Retainer Payment
If an Operator's engagement ends or is terminated then Boral may deduct from any cartage payment owing to the Operator any amount overpaid on account of a monthly retainer paid in advance by Boral.
1.4. Meanings:
For the purposes of this Schedule the following meanings shall apply:
"regular days" see definition in Dictionary (refer Clause 1)
"retainer reduction factor"
Six Wheeler Vehicle: The dollar amount determined by multiplying the six wheeler retainer rate (Schedule I Item A) by 12 then dividing this total by 290.
Eight Wheeler Vehicle: The dollar amount determined by multiplying the eight wheeler retainer rate (Schedule 1 Item A) by 12 then dividing this total by 290.