Previous PageNext Page

AN120154 – Concrete Pipe and Concrete Products Factories Consolidated (State) Award

32. REST PERIODS

All employees shall be entitled to two rest intervals of 7.5 minutes duration to be taken prior to the meal interval and a further rest interval of 7.5 minutes duration shall be taken after the meal interval where the employee is required to work more than six hours on any day or shift. The rest intervals shall be taken at such times that will not interfere with the continuity of work. Such intervals are to be counted as time worked.

Top Of PagePrevious PageNext Page