AP789529CRV - Metal, Engineering and Associated Industries Award 1998
5.1A TRANSITIONAL WAGE RATES FOR VICTORIA—APPLICATION OF COMMON RULE AWARD
[Pt 1:Pt 5:5.1A inserted by PR959867 ppc 07Jun05]
5.1A.1 Clause 5.1A of this award contains the transitional rates of pay and allowances for employers in the state of Victoria who were previously not bound by this award, but are now subject to the award by virtue of the award having been declared a common rule under s.141 of the Workplace Relations Act 1996.
5.1A.2 These transitional rates of pay and allowances shall not apply after the beginning of the first pay period commencing on or after 1 August 2005.
5.1A.3 Schedule of rates of pay (clause 5.1.1(c))
Wage group |
Weekly award rate |
Hourly rate |
$ |
$ | |
C14 |
467.40 |
12.30 |
C13 |
484.10 |
12.74 |
C12 |
506.60 |
13.33 |
C11 |
527.50 |
13.88 |
C10 |
561.20 |
14.77 |
C9 |
582.10 |
15.32 |
C8 |
602.90 |
15.87 |
C7 |
621.80 |
16.36 |
C6 |
663.50 |
17.46 |
C5 |
684.40 |
18.01 |
C4 |
705.20 |
18.56 |
C3 |
746.90 |
19.66 |
C2(a) |
767.80 |
20.21 |
C2(b) |
805.50 |
21.20 |
C1(a) |
889.00 |
23.39 |
C1(b) |
1014.10 |
26.69 |
5.1A.4 Apprentice rates of pay (clause 5.3.1)
4-year term apprenticeship |
% of C10 level |
Total weekly rate |
Hourly rate |
% |
$ |
$ | |
First |
42 |
235.70 |
6.20 |
Second |
55 |
308.70 |
8.12 |
Third |
75 |
420.90 |
11.08 |
Fourth |
88 |
493.90 |
13.00 |
5.1A.5 Apprentice rates of pay (clause 5.4.3)
Year of Apprenticeship |
Total weekly rate |
$ | |
First |
438.00 |
Second |
467.40 |
Third |
484.10 |
Fourth |
506.60 |
5.1A.6 Unapprenticed juniors (clause 5.5.1)
Age |
% of C13 level |
Rate per week |
% |
$ | |
Under 16 years of age |
36.8 |
178.10 |
At 16 years of age |
47.3 |
229.00 |
At 17 years of age |
57.8 |
279.80 |
At 18 years of age |
68.3 |
330.60 |
At 19 years of age |
82.5 |
399.40 |
At 20 years of age |
97.7 |
473.00 |
5.1A.7 Trainee rates of pay (clause 5.6.2(a))
5.1A.7(a) On completion of Skill Level A
School Leaver |
Year 10 |
Year 11 |
Year 12 |
$ |
$ |
$ | |
Plus 1 year |
289.80 |
354.50 |
412.80 |
Plus 2 years |
354.50 |
412.80 |
479.10 |
Plus 3 years |
412.80 |
479.10 |
Note 1 |
Plus 4 years |
479.10 |
Note 1 |
|
Plus 5 years |
Note 1 |
5.1A.7(b) On completion of Skill Level B
School Leaver |
Year 10 |
Year 11 |
Year 12 |
$ |
$ |
$ | |
Plus 1 year |
305.60 |
341.50 |
392.20 |
Plus 2 years |
341.50 |
392.20 |
459.10 |
Plus 3 years |
392.20 |
459.10 |
Note 1 |
Plus 4 years |
459.10 |
Note 1 |
|
Plus 5 years |
Note 1 |
5.1A.7(c) On completion of Skill Level C
School Leaver |
Year 10 |
Year 11 |
Year 12 |
$ |
$ |
$ | |
Plus 1 year |
307.60 |
320.90 |
362.00 |
Plus 2 years |
320.90 |
362.00 |
404.80 |
Plus 3 years |
362.00 |
404.80 |
Note 1 |
Plus 4 years |
404.80 |
Note 1 |
|
Plus 5 years |
Note 1 |
Note 1: Insert appropriate classification rate as specified in clause 5.1 of the award.
5.1A.8 Allowances
Clause |
Allowance |
Transitional allowance | |
$ | |||
5.9.1(a) |
Leading hands |
||
3 to 10 employees |
24.60 | ||
11 to 20 employees |
36.70 | ||
more than 20 employees |
46.70 | ||
5.9.1(b) |
Ship repairing |
||
Tradespersons |
11.20 | ||
All other employees |
9.00 | ||
5.9.1(c) |
Multi-storey building |
17.70 | |
5.9.1(d)(i) |
Tool allowance - Tradespersons and apprentices |
12.00 | |
5.9.1(e) |
Tool allowance - Carpenter or joiner or shipwright/boatbuilder |
22.80 | |
5.9.2(a) |
Motor allowance |
0.60 | |
5.9.2(b) |
First aid allowance |
11.20 | |
5.9.3(c) |
Cold places |
0.41 | |
5.9.3(d) |
Hot places |
||
between 46 and 54 Celsius |
0.42 | ||
in excess of 54 Celsius |
0.56 | ||
5.9.3(e) |
Wet places |
0.42 | |
5.9.3(f) |
Confined spaces |
0.56 | |
5.9.3(g) |
Dirty work |
||
other than ship repair work |
0.42 | ||
ship repair work |
0.56 | ||
5.9.3(h) |
Height money |
0.31 | |
5.9.3(i) |
Meat digesters and oil tanks |
0.42 | |
5.9.3(j) |
Sanitary works |
0.29 | |
5.9.3(k) |
Insulation materials |
0.55 | |
5.9.3(l) |
Slaughtering yards |
0.31 | |
5.9.3(m) |
Boiler repairs |
||
smoke-boxes, fire-boxes, furnaces or flues |
0.31 | ||
repairs to oil fired boilers |
1.11 | ||
5.9.3(o) |
Explosive powered tools |
1.12 | |
5.9.3(p) |
Ships in dock |
0.31 | |
5.9.3(q)(i) |
Foundry allowance |
0.32 | |
5.9.3(r) |
Boiling down works |
0.31 | |
5.9.3(s) |
Lead works |
0.31 | |
5.9.4(b)(iv) |
Travelling, transport and fares |
9.40 | |
6.4.11(a) |
Meal allowance |
9.40 |
5.1A.9 Unapprenticed juniors In foundries (Schedule C clause 3.2.2)
Age |
% of C13 Level |
Rate per week |
% |
$ | |
Under 16 years of age |
36.8 |
178.10 |
At 16 years of age |
47.3 |
229.00 |
At 17 years of age |
68.3 |
330.60 |
At 18 years of age |
83.0 |
401.80 |
At 19 years of age |
98.8 |
478.30 |
At 20 years of age |
Adult Rate |
5.1A.10 Air conditioning industry—Queensland—workshop tradesperson (Level C10) (Schedule C clause 3.3.3)
$ | |
Weekly award rate |
561.20 |
Air-conditioning industry allowance |
56.30 |
Tool Allowance |
12.00 |
Total weekly award rate (all purpose) |
629.50 |
Total hourly award rate (all purpose) |
16.57 |
5.1A.11 Air conditioning industry—Queensland—other adult classifications (Schedule C clause 3.3.4)
% of total weekly award wage rate for a workshop tradesperson |
Total weekly rate (including safety net adjustment) |
Total hourly rate (including safety net adjustment) | |
% |
$ |
$ | |
Workshop Employee 1 |
97.5 |
613.80 |
16.15 |
Workshop Employee 2 |
87.0 |
547.70 |
14.41 |
5.1A.12 Air conditioning industry—Queensland—apprentices (Schedule C clause 3.3.5)
Year of Apprenticeship |
% of weekly all purpose rate for workshop tradesperson |
Rate per week |
Rate per hour |
% |
$ |
$ | |
First year |
42 |
264.40 |
6.96 |
Second year |
55 |
346.20 |
9.11 |
Third year |
75 |
472.10 |
12.42 |
Fourth year |
88 |
554.00 |
14.58 |
5.1A.13 Air conditioning industry—South Australia—Workshop tradesperson (Level C10) (Schedule C clause 3.4.3)
$ | |
Weekly award rate |
561.20 |
Air-conditioning industry allowance |
45.70 |
Tool allowance |
12.00 |
All purpose wage rate |
618.90 |
* Composite special rates allowance |
8.90 |
Total weekly award rate (all purpose) |
627.80 |
Total hourly award wage rate (all purpose) |
16.52 |
5.1A.14 Air conditioning industry—South Australia—Other adult classifications (Schedule C clause 3.4.4)
% of total weekly award wage rate for a workshop tradesperson |
Total weekly rate (including safety net adjustment) |
Total hourly rate (including safety net adjustment) | |
% |
$ |
$ | |
Workshop Employee 1 |
97.5 |
612.10 |
16.11 |
Workshop Employee 2 |
87.0 |
546.20 |
14.37 |
5.1A.15 Air conditioning industry—South Australia—Apprentices (Schedule C clause 3.4.5)
Year of Apprenticeship |
% of weekly all purpose rate for workshop tradesperson |
Rate per week |
Rate per hour |
% |
$ |
$ | |
First year |
42 |
263.70 |
6.94 |
Second year |
55 |
345.30 |
9.09 |
Third year |
75 |
470.90 |
12.39 |
Fourth year |
88 |
552.50 |
14.54 |
5.1A.16 Allowances (Schedule C clauses 4–10)
Current clause |
Allowance |
Transitional allowance | |
4 |
All purpose allowances |
$ | |
4.1.1 |
Construction allowance - BHP Steel (AIS) Pty Ltd, Port Kembla |
37.00 | |
4.2.1 |
Construction allowance - BHP Steel (AIS) Pty Ltd, Newcastle |
36.30 | |
4.3.1 |
Air conditioning allowance - New South Wales |
45.20 | |
4.3.2 |
Air conditioning allowance - NSW - Apprentices |
||
during their first year of apprenticeship |
19.50 | ||
during their second year of apprenticeship |
25.49 | ||
during their third year of apprenticeship |
34.66 | ||
during their fourth year of apprenticeship |
40.77 | ||
5 |
Special rates |
$ | |
5.1 |
No. 21 Dump BHP Steel (AIS) Pty Ltd Port Kembla |
0.82 | |
5.2 |
NSW Sugar Milling Co-operative Limited |
||
5.2.1 |
spot welding mill rollers |
2.18 | |
5.2.2 |
work inside the door line of a boiler |
1.23 | |
5.2.3(a) |
Disability allowance |
0.41 | |
8.3 |
Asbestos eradication or removal |
1.31 | |
10 |
Agricultural Implement Making |
||
10.3.1 |
Motor allowance |
0.31 | |
10.3.2 |
Meal allowance |
8.80 | |
10.3.4 |
Motor drivers |
||
10.3.4(a) |
For each additional complete tonne over 5 tonnes |
0.65 | |
10.3.4(b) |
Motor (not being a tractor) drawing a trailer |
||
each loaded single axle trailer |
1.09 | ||
each loaded trailer other than a single axle trailer |
1.36 | ||
each empty trailer other than a single axle trailer |
0.76 | ||
10.3.5 |
Articulated vehicle (semi trailer) |
0.65 | |
10.3.6 |
Mobile crane |
0.65 | |
10.3.7 |
Fork lift |
0.97 | |
10.3.8 |
Tractor driver |
||
each loaded single axle trailer |
1.09 | ||
each loaded trailer other than a single axle trailer |
0.61 | ||
each empty trailer other than a single axle trailer |
1.36 | ||
10.3.9 |
Service work away from ordinary place of employment |
2.54 |