Introduction
As part of the 4 yearly review, the Timber Industry Award 2010 (MA000071) was reviewed by a Full Bench of the Commission.
As part of the 4 yearly review, the Timber Industry Award 2010 (MA000071) was reviewed by a Full Bench of the Commission.
Current copy of the Timber Industry Award 2020
Organisation | Document title | Document date | Date uploaded |
---|---|---|---|
Fair Work Commission | Determination – Timber Industry Award 2020 – correction | 11/11/2020 | 11/11/2020 |
CFMMEU - Manufacturing Division | Submission - Textile and Timber Awards | 17/10/2020 | 19/10/2020 |
Fair Work Commission | Determination - Timber Industry Award 2020 | 07/10/2020 | 07/10/2020 |
Fair Work Commission | Decision - [2020] FWCFB 5307 | 06/10/2020 | 06/10/2020 |
CFMMEU - Manufacturing Division | Submission in reply - Tranche 3 - exposure draft and draft determination | 26/06/2020 | 26/06/2020 |
CFMMEU - Manufacturing Division | Correspondence and reply from FWC - extension of time | 24/06/2020 | 24/06/2020 |
Australian Business Industrial and NSW Business Chamber | Submission - Tranche 3 | 19/06/2020 | 19/06/2020 |
Housing Industry Association | Submission - Tranche 3 | 17/06/2020 | 17/06/2020 |
Fair Work Commission | Determination | 12/06/2020 | 12/06/2020 |
Fair Work Commission | Decision - [2020] FWCFB 3074 | 12/06/2020 | 12/06/2020 |
Fair Work Commission | Statement - [2020] FWCFB 2984 | 10/06/2020 | 10/06/2020 |
Fair Work Commission | Report - Tranche 3 - Timber Industry Award | 05/06/2020 | 05/06/2020 |
Australian Industry Group | Correspondence | 04/06/2020 | 04/06/2020 |
CFMMEU - Manufacturing Division | Submission - exposure draft - Tranche 3 | 01/06/2020 | 01/06/2020 |
Fair Work Commission | Statement - [2020] FWC 2591 | 18/05/2020 | 18/05/2020 |
Fair Work Commission | Notice of listing - 4/06/2020 - Tranche 3 - Timber Industry Award | 18/05/2020 | 18/05/2020 |
Fair Work Commission | Exposure draft – Timber Industry Award – changes tracked – 8/05/2020 | 08/05/2020 | 08/05/2020 |
Fair Work Commission | Draft award variation determination – Timber Industry Award – 8/05/2020 | 08/05/2020 | 08/05/2020 |
Fair Work Commission | Decision - [2020] FWCFB 2124 | 27/04/2020 | 27/04/2020 |
Fair Work Commission | Report to Full Bench - Tranche 3 - Timber Industry Award | 15/04/2020 | 16/04/2020 |
CFMMEU - Manufacturing Division | Submission in reply - Tranche 3 | 09/04/2020 | 09/04/2020 |
Australian Manufacturing Workers’ Union | Submission in reply - Tranche 3 - multiple modern awards | 07/04/2020 | 08/04/2020 |
Australian Industry Group | Submission in reply - Tranche 3 - multiple modern awards | 07/04/2020 | 08/04/2020 |
Australian Business Industrial and NSW Business Chamber | Submission in reply - Tranche 3 - exposure drafts - multiple modern awards | 07/04/2020 | 08/04/2020 |
Fair Work Commission | Statement - [2020] FWCFB 1827 | 07/04/2020 | 07/04/2020 |
Housing Industry Association | Submission in reply - Tranche 3 - exposure draft | 07/04/2020 | 07/04/2020 |
Fair Work Commission | Background paper - Tranche 3 | 23/03/2020 | 23/03/2020 |
Fair Work Commission | Statement - [2020] FWCFB 1539 | 23/03/2020 | 23/03/2020 |
Fair Work Commission | Notice of listing - 1/04/2020 - Timber Award - amended | 25/03/2020 | 17/03/2020 |
CFMMEU - Manufacturing Division | Submission in reply - Tranche 3 - exposure draft | 10/03/2020 | 10/03/2020 |
CFMMEU - Manufacturing Division | Correspondence and FWC correspondence in reply - extension of time | 06/03/2020 | 10/03/2020 |
Fair Work Commission | Statement - [2020] FWC 1256 | 10/03/2020 | 10/03/2020 |
Australian Business Industrial and NSW Business Chamber | Submission - Tranche 3 - exposure drafts - multiple modern awards | 06/03/2020 | 06/03/2020 |
Australian Industry Group | Submissions - Tranche 3 - exposure drafts - multiple modern awards | 06/03/2020 | 06/03/2020 |
Australian Manufacturing Workers' Union | Submission - Tranche 3 - exposure drafts - multiple modern awards | 05/03/2020 | 05/03/2020 |
Fair Work Commission | Exposure draft – Timber Industry Award – changes tracked | 29/01/2020 | 29/01/2020 |
Fair Work Commission | Draft award variation determination – Timber Industry Award | 29/01/2020 | 29/01/2020 |
Fair Work Commission | Decision - [2020] FWCFB 421 | 29/01/2020 | 29/01/2020 |
Fair Work Commission | Decision - [2019] FWCFB 6935 | 14/10/2019 | 14/10/2019 |
Fair Work Commission | Transcript - 9/10/2019 | 10/10/2019 | 11/10/2019 |
Fair Work Commission | Statement - [2019] FWCFB 6899 | 08/10/2019 | 08/10/2019 |
Fair Work Commission | AM2019/17 - notice of listing - 9/10/2019 - amended | 08/10/2019 | 08/10/2019 |
Australian Manufacturing Workers' Union | Submissions on Tranche 1 and submissions in reply exposure drafts - multiple awards | 30/09/2019 | 30/09/2019 |
CFMMEU - Manufacturing Division | Submission in reply - multiple awards - exposure drafts | 27/09/2019 | 30/09/2019 |
Australian Industry Group | Submission in reply - multiple awards - exposure drafts | 23/09/2019 | 23/09/2019 |
Fair Work Commission | Decision - [2019] FWCFB 6077 | 02/09/2019 | 02/09/2019 |
Fair Work Commission | AM2014/1 and AM2016/15 - notice of listing - 29/04/2019 - further amended | 18/04/2019 | 23/04/2019 |
CFMMEU - Manufacturing Division | Correspondence and reply from FWC - extension of time | 15/03/2019 | 15/03/2019 |
Australian Industry Group | Submission - Group 1 Awards - exposure drafts | 13/03/2019 | 13/03/2019 |
Australian Business Industrial and NSW Business Chamber | Submission - Group 1 Awards - exposure drafts | 13/03/2019 | 13/03/2019 |
Fair Work Commission | AM2014/1 - notice of listing - 3/04/2019 - amended | 28/02/2019 | 01/03/2019 |
Fair Work Commission | Statement - [2019] FWC 1262 | 28/02/2019 | 28/02/2019 |
Fair Work Commission | Statement - [2019] FWC 932 | 13/02/2019 | 13/02/2019 |
Fair Work Commission | Exposure draft - Timber Industry Award - revised | 13/02/2019 | 13/02/2019 |
Fair Work Commission | Statement - [2019] FWC 717 | 06/02/2019 | 07/02/2019 |
Fair Work Commission | Statement - [2018] FWC 7869 | 24/12/2018 | 24/12/2018 |
Fair Work Commission | Decision - [2018] FWCFB 5602 | 12/09/2018 | 12/09/2018 |
CFMMEU - Manufacturing Division | Submission - Group 1 Awards | 19/07/2018 | 19/07/2018 |
Australian Industry Group | Submission - Group 1 Awards | 16/07/2018 | 17/07/2018 |
United Voice | Correspondence and correspondence in reply from FWC - Group 1 Awards - extension of time | 16/07/2018 | 16/07/2018 |
Australian Manufacturing Workers' Union | Submission - Group 1 - various awards | 16/07/2018 | 16/07/2018 |
The Australian Workers' Union | Submission - Group 1 - various awards | 13/07/2018 | 13/07/2018 |
Fair Work Commission | Decision - [2018] FWCFB 3802 | 28/06/2018 | 28/06/2018 |
Fair Work Commission | Summary of submissions - outstanding issues - revised | 22/03/2018 | 22/03/2018 |
Fair Work Commission | Statement - [2018] FWC 1631 | 21/03/2018 | 21/03/2018 |
CFMEU - Forestry, Furnishing, Building Products & Manufacturing Division | Submission - casual conversion clause | 19/01/2018 | 22/01/2018 |
Australian Industry Group | Submission - casual conversion clause | 19/01/2018 | 19/01/2018 |
Australian Manufacturing Workers' Union | Correspondence and correspondence in reply - exposure drafts - casual conversion clause - extension of time | 05/01/2018 | 08/01/2018 |
Business SA | Submission - group 3 decision - all purpose allowances - occupational health and safety - Pastoral Award | 04/08/2017 | 07/08/2017 |
Australian Manufacturing Workers' Union | Correspondence - exposure drafts - casual conversion clause | 02/08/2017 | 02/08/2017 |
CFMEU - Construction and General Division | Submission - group 3 decision - all purpose allowances - occupational health and safety | 31/07/2017 | 31/07/2017 |
Australian Manufacturing Workers' Union | Submission - group 3 decision - all purpose allowances - occupational health and safety | 28/07/2017 | 31/07/2017 |
Australian Industry Group | Submission - exposure draft | 11/07/2017 | 11/07/2017 |
Australian Business Industrial and NSW Business Chamber | Submission - exposure draft | 07/07/2017 | 07/07/2017 |
Australian Industry Group | Correspondence and correspondence in reply from FWC - extension of time | 03/07/2017 | 03/07/2017 |
Australian Business Industrial and NSW Business Chamber | Correspondence and correspondence in reply from FWC - extension of time | 03/07/2017 | 03/07/2017 |
Australian Manufacturing Workers' Union | Correspondence and correspondence in reply from FWC - extension of time | 27/06/2017 | 27/06/2017 |
Fair Work Commission | Summary of submissions on revised exposure draft | 13/06/2017 | 13/06/2017 |
Fair Work Commission | Exposure draft - Timber Industry Award 2015 - further amended | 13/06/2017 | 13/06/2017 |
Fair Work Commission | Decision - [2017] FWCFB 3177 | 09/06/2017 | 09/06/2017 |
Australian Industry Group | Submission - all awards - general issues in exposure drafts | 31/08/2016 | 02/09/2016 |
Australian Industry Group | Submission in reply - revised exposure drafts | 07/12/2015 | 10/12/2015 |
The Australian Workers' Union | Submissions in reply - revised exposure drafts | 04/12/2015 | 07/12/2015 |
Business SA | Submissions - revised exposure drafts | 27/11/2015 | 30/11/2015 |
Australian Industry Group | Submission - revised exposure drafts | 20/11/2015 | 24/11/2015 |
Australian Federation of Employers and Industries | Submissions - revised exposure drafts | 23/11/2015 | 23/11/2015 |
Business SA | Correspondence - request for extension of time | 20/11/2015 | 23/11/2015 |
The Australian Workers' Union | Submissions - revised exposure drafts | 20/11/2015 | 23/11/2015 |
AMWU | Submissions - revised exposure drafts | 20/11/2015 | 20/11/2015 |
Fair Work Commission | Exposure draft - Timber Industry Award 2010 - amended | 02/11/2015 | 02/11/2015 |
Fair Work Commission | Decision - [2015] FWCFB 7236 | 23/10/2015 | 23/10/2015 |
Fair Work Commission | Decision - [2015] FWCFB 6656 | 30/09/2015 | 30/09/2015 |
Fair Work Commission | Full Bench decision - [2015] FWCFB 4658 - ordinary hourly rate of pay | 13/07/2015 | 14/07/2015 |
Fair Work Commission | Determination - substantive issues | 18/06/2015 | 18/06/2015 |
Fair Work Commission | Full Bench decision - substantive issues | 18/06/2015 | 18/06/2015 |
Ai Group | Further submission - substantive issues | 21/05/2015 | 29/05/2015 |
Master Builders Australia | Reply submission - substantive issues | 20/05/2015 | 20/05/2015 |
Fair Work Commission | Memorandum to parties - substantive issues | 14/05/2015 | 14/05/2015 |
CFMEU - Forestry and Furnishing Products Division | Further submission - substantive issues | 13/05/2015 | 14/05/2015 |
CFMEU - Forestry and Furnishing Products Division | Response to the memorandum | 04/05/2015 | 05/05/2015 |
CFMEU - Forestry and Furnishing Products Division | Correspondence | 01/05/2015 | 01/05/2015 |
Master Builders Australia Ltd | Correspondence | 30/04/2015 | 30/04/2015 |
CFMEU - Forestry and Furnishing Products Division | Exhibit 13 | 23/04/2015 | 30/04/2015 |
Housing Industry Association | Correspondence | 30/04/2015 | 30/04/2015 |
Fair Work Commission | Transcript - 23/04/2015 | 30/04/2015 | 30/04/2015 |
Fair Work Commission | Memorandum to parties | 23/04/2015 | 24/04/2015 |
Ai Group | Final submission | 20/04/2015 | 22/04/2015 |
CFMEU - Forestry and Furnishing Products Division | Submission | 20/04/2015 | 21/04/2015 |
Australian Business Industrial and the New South Wales Business Chamber | Submission | 20/04/2015 | 20/04/2015 |
Fair Work Commission | Transcript - 13/04/2015 | 20/04/2015 | 20/04/2015 |
Master Builders Australia | Submission | 20/04/2015 | 20/04/2015 |
CFMEU - Forestry and Furnishing Products Division | Submission | 13/04/2015 | 17/04/2015 |
Fair Work Commission | Correspondence from FWC | 15/04/2015 | 15/04/2015 |
Fair Work Commission | Notice of listing - 23/04/2015 | 13/04/2015 | 13/04/2015 |
CFMEU - Forestry and Furnishing Products Division | Correspondence and other materials | 10/04/2015 | 13/04/2015 |
CFMEU - Forestry and Furnishing Products Division | Submission | 09/04/2015 | 09/04/2015 |
Fair Work Commission | Transcript - 16/03/2015 | 27/03/2015 | 27/03/2015 |
Fair Work Commission | Correspondence from FWC | 17/03/2015 | 18/03/2015 |
Fair Work Commission | Notice of listing - 13/04/2015 | 13/03/2015 | 16/03/2015 |
Ai Group | Correspondence | 16/03/2015 | 16/03/2015 |
Master Builders Australia | Correspondence | 13/03/2015 | 13/03/2015 |
Ai Group | Reply submission | 13/03/2015 | 13/03/2015 |
Fair Work Commission | Correspondence in reply from FWC | 13/03/2015 | 13/03/2015 |
Fair Work Commission | Full Bench decision - CFMEU proposed term - payment of wages - 'Andrews' legal point - amended | 11/03/2015 | 13/03/2015 |
Housing Industry Association | Correspondence | 13/03/2015 | 13/03/2015 |
CFMEU - Forestry & Furnishing Products Division | Form F53 Notice of representative commencing to act | 12/03/2015 | 13/03/2015 |
CFMEU - Forestry & Furnishing Products Division | Correspondence | 12/03/2015 | 13/03/2015 |
Housing Industry Association | Correspondence | 12/03/2015 | 12/03/2015 |
Australian Federation of Employers and Industries | Correspondence | 12/03/2015 | 12/03/2015 |
Ai Group | List of authorities | 12/03/2015 | 12/03/2015 |
Australian Business Industrial and the NSW Business Chamber Ltd | Correspondence | 12/03/2015 | 12/03/2015 |
Master Builders Australia | Correspondence in reply | 11/03/2015 | 11/03/2015 |
Fair Work Commission | Full Bench decision - CFMEU proposed term - payment of wages - 'Andrews' legal point | 11/03/2015 | 11/03/2015 |
Fair Work Commission | Directions | 11/03/2015 | 11/03/2015 |
CFMEU - Forestry and Furnishing Division | Correspondence | 11/03/2015 | 11/03/2015 |
Fair Work Commission | Transcript - 20/02/2015 | 20/02/2015 | 04/03/2015 |
Australian Federation of Employers and Industries | Reply submission | 27/02/2015 | 27/02/2015 |
Master Builders Australia | Correspondence | 19/02/2015 | 19/02/2015 |
Australian Business Industrial and the NSW Business Chamber Ltd | Submission | 13/02/2015 | 13/02/2015 |
Fair Work Commission | Correspondence from FWC | 13/02/2015 | 13/02/2015 |
Australian Business Industrial and the NSW Business Chamber Ltd | Correspondence | 12/02/2015 | 13/02/2015 |
AMWU | Correspondence | 11/02/2015 | 11/02/2015 |
Fair Work Commission | Correspondence in reply from FWC | 10/02/2015 | 10/02/2015 |
Fair Work Commission | Correspondence in reply from FWC | 10/02/2015 | 10/02/2015 |
The Australian Workers Union | Correspondence | 10/02/2015 | 10/02/2015 |
Australian Business Industrial and the NSW Business Chamber Ltd | Correspondence | 09/02/2015 | 10/02/2015 |
Australian Council of Trade Unions | Submission | 09/02/2015 | 09/02/2015 |
CFMEU - Forestry & Furnishing Products Division | Outline of submissions | 09/02/2015 | 09/02/2015 |
Fair Work Commission | Notice of listing - 20/02/2015 - amended | 09/02/2015 | 09/02/2015 |
The Australian Workers Union | Outline of submissions In reply | 06/02/2015 | 09/02/2015 |
Australian Federation of Employers and Industries | Correspondence | 06/02/2015 | 06/02/2015 |
Ai Group | Submission | 06/02/2015 | 06/02/2015 |
CFMEU - Construction and General Division | Submission | 06/02/2015 | 06/02/2015 |
Housing Industry Association | Submission | 06/02/2015 | 06/02/2015 |
Master Builders Australia | Submission | 06/02/2015 | 06/02/2015 |
CFMEU - Forestry & Furnishing Products Division | Submissions - amended and republished | 19/12/2014 | 27/01/2015 |
Master Builders Australia | Submission | 16/01/2015 | 16/01/2015 |
Fair Work Commission | Full Bench decision Award stage exposure drafts Group 1A and 1B General drafting alleged inconsistencies with NES | 23/12/2014 | 02/01/2015 |
CFMEU - Forestry & Furnishing Products Division | Submissions | 21/12/2014 | 22/12/2014 |
Housing Industry Association | Submission | 19/12/2014 | 19/12/2014 |
Fair Work Commission | Notice of Listing - 20/02/2015 | 05/12/2014 | 05/12/2014 |
Fair Work Commission | Directions | 05/12/2014 | 05/12/2014 |
Fair Work Commission | Directions - amended | 04/12/2014 | 04/12/2014 |
CFMEU - Forestry & Furnishing Products Division | Notice of representative commencing to act | 03/12/2014 | 04/12/2014 |
Fair Work Commission | Correspondence from FWC | 25/11/2014 | 25/11/2014 |
Australian Industry Group | Correspondence - Take-Home Pay | 24/11/2014 | 25/11/2014 |
CFMEU - Forestry & Furnishing Products Division | Correspondence | 24/11/2014 | 24/11/2014 |
ACTU | Correspondence on NTW schedules | 19/11/2014 | 20/11/2014 |
Fair Work Commission | Notice of Listing - 16/03/2015 | 19/11/2014 | 19/11/2014 |
Fair Work Commission | Transcript - 17/11/2014 | 17/11/2014 | 18/11/2014 |
Fair Work Commission | Directions | 18/11/2014 | 18/11/2014 |
Fair Work Commission | Directions - amended - substantive issues | 18/11/2014 | 18/11/2014 |
Fair Work Commission | Notice of listing - 24/11/2014 | 17/11/2014 | 17/11/2014 |
Master Builders Australia | Submission on exposure drafts - NES | 17/11/2014 | 17/11/2014 |
Australian Business Industrial and NSW Business Chamber Ltd | Reply submission on exposure drafts | 14/11/2014 | 17/11/2014 |
Fair Work Commission | Final schedule - 17 - 19/11/2014 | 14/11/2014 | 14/11/2014 |
Fair Work Commission | Summary of submissions | 14/11/2014 | 14/11/2014 |
Australian Industry Group | Supplementary submission on exposure drafts | 13/11/2014 | 14/11/2014 |
Australian Industry Group | Reply submission on exposure drafts - redundancy clause | 12/11/2014 | 13/11/2014 |
CFMEU - Forestry and Furnishing Division | Submissions in reply on exposure draft | 13/11/2014 | 13/11/2014 |
Australian Workers' Union | Submission in reply on exposure draft | 12/11/2014 | 13/11/2014 |
AMWU | Submission in reply on exposure draft | 12/11/2014 | 13/11/2014 |
Fair Work Commission | Notice of listing - 17, 18 and 19/11/2014 - amended | 12/11/2014 | 12/11/2014 |
Fair Work Commission | Notice of listing - 14/11/2014 - further amended | 12/11/2014 | 12/11/2014 |
Housing Industry Association | Submission on exposure draft | 11/11/2014 | 12/11/2014 |
Fair Work Commission | Transcript - 6/11/2014 | 06/11/2014 | 12/11/2014 |
Fair Work Commission | Notice of listing - 14/11/2014 - amended | 11/11/2014 | 11/11/2014 |
Fair Work Commission | Proposed schedule - 17 - 19/11/2014 | 11/11/2014 | 11/11/2014 |
Master Builders Australia | Submission | 05/11/2014 | 05/11/2014 |
Fair Work Commission | Notice of listing - 6/11/2014 - amended | 05/11/2014 | 05/11/2014 |
ACTU | Further submissions on exposure drafts | 31/10/2014 | 31/10/2014 |
Australian Industry Group | Submission on exposure drafts | 24/10/2014 | 27/10/2014 |
Australian Business Industrial and NSW Business Chamber Ltd | Outline of submissions on exposure drafts | 27/10/2014 | 27/10/2014 |
Fair Work Commission | Notice of Listing - 6/11/2014 | 27/10/2014 | 27/10/2014 |
Australian Federation of Employers and Industries | Submissions on exposure drafts | 24/10/2014 | 27/10/2014 |
Australian Manufacturing Workers' Union - Vehicle Division | Correspondence - extension of time | 24/10/2014 | 24/10/2014 |
CFMEU - Forestry and Furnishing Division | Submissions on the exposure draft | 24/10/2014 | 24/10/2014 |
Housing Industry Association | Correspondence | 23/10/2014 | 24/10/2014 |
The Australian Workers Union | Submissions on the exposure draft | 20/10/2014 | 20/10/2014 |
Australian Business Industrial and NSW Business Chamber Ltd | Correspondence - extension of time | 20/10/2014 | 20/10/2014 |
Fair Work Commission | Correspondence in reply from FWC | 20/10/2014 | 20/10/2014 |
Housing Industry Association | Correspondence | 17/10/2014 | 17/10/2014 |
CFMEU - Forestry & Furnishing Products Division | Submission in reply | 15/10/2014 | 15/10/2014 |
CFMEU - Forestry & Furnishing Products Division | Correspondence in reply from FWC | 10/10/2014 | 13/10/2014 |
Fair Work Commission | Correspondence in reply from FWC | 10/10/2014 | 13/10/2014 |
Fair Work Commission | Notice of listing - 17 and 18/11/2014 | 08/10/2014 | 08/10/2014 |
Fair Work Commission | Notice of listing - 14/11/2014 | 08/10/2014 | 08/10/2014 |
Fair Work Commission | Comparison of exposure draft to modern award | 29/09/2014 | 29/09/2014 |
Fair Work Commission | Exposure Draft - Timber Industry Award 2010 | 29/09/2014 | 29/09/2014 |
Fair Work Commission | Report to the Full Bench | 18/07/2014 | 18/07/2014 |
Master Builders Australia | Correspondence | 30/06/2014 | 08/07/2014 |
Housing Industry Association | Correspondence | 01/07/2014 | 01/07/2014 |
CFMEU - Forestry & Furnishing Products Division | Correspondence re: directions | 01/07/2014 | 01/07/2014 |
CFMEU - Forestry & Furnishing Products Division | Correspondence re: clause B.3.1(b)(iii) | 01/07/2014 | 01/07/2014 |
CFMEU - Forestry & Furnishing Products Division | Correspondence and party's draft determination | 25/06/2014 | 30/06/2014 |
Ai Group | Correspondence | 24/06/2014 | 30/06/2014 |
Fair Work Commission | Directions | 27/06/2014 | 27/06/2014 |
CFMEU - Forestry & Furnishing Products Division | Submission - re award brief | 24/06/2014 | 25/06/2014 |
Housing Industry Association | Correspondence | 06/06/2014 | 06/06/2014 |
Fair Work Commission | Award brief | 06/06/2014 | 06/06/2014 |
CFMEU - Forestry & Furnishing Products Division | Correspondence | 05/06/2014 | 05/06/2014 |
Fair Work Commission | Notice of Listing - 10/06/2014 - Amended | 30/05/2014 | 30/05/2014 |
Fair Work Commission | Notice of Listing - 10/06/2014 | 29/05/2014 | 29/05/2014 |
Fair Work Commission | Transcript - 13/05/2014 | 13/05/2014 | 28/05/2014 |
Textile, Clothing and Footwear Union of Australia | Correspondence re: Transcript - 13/05/2014 | 27/05/2014 | 28/05/2014 |
Fair Work Ombudsman | Outline of coverage clause issues in modern awards | 20/05/2014 | 22/05/2014 |
ACTU | Correspondence | 19/05/2014 | 20/05/2014 |
Fair Work Ombudsman | Correspondence | 12/05/2014 | 14/05/2014 |
The Australian Workers Union | Correspondence | 10/05/2014 | 13/05/2014 |
ACTU | Correspondence | 09/05/2014 | 12/05/2014 |
Australian Manufacturing Workers' Union | Outline of issues identified | 09/05/2014 | 12/05/2014 |
Fair Work Ombudsman | Outline of issues identified | 09/05/2014 | 12/05/2014 |
Housing Industry Association | Outline of issues identified - amended | 09/05/2014 | 12/05/2014 |
CFMEU - Forestry & Furnishing Products Division | Outline of issues identified | 09/05/2014 | 09/05/2014 |